Browser-only records · Updates and history are saved on this browser and device. Download a backup to transfer or retain records. The supplied 10/24/26 template starts with all 130 units Up; existing saved edits are retained.
Total units
0
16 equipment categories
Up · Available
0
Down · Unavailable
0
Every status except Up
Groups meeting minimum
0
15 availability groups
Garland Fleet Availability Chart
Requirement coverage = Up ÷ Minimum Needed. Availability = Up ÷ Total Units. Residential and Recycle ASL are combined in this chart.
| Equipment Group | Total Units | Up | Minimum Needed | Requirement Coverage | Surplus / Deficit | Meets Minimum | Availability |
|---|
Status counts and definitions
| Status | Availability | Description |
|---|
Unit Status & Repair Updates
| Unit | Equipment Group | Status | Date Reported | Vehicle Issue Reported by Sanitation | Fleet Updates and Notes | Action |
|---|
Garland Fleet Status Change Log
Add one row for every status change. Close the prior active row with a Status End Date before adding the new status.
Saving a changed status performs both steps automatically. Days in Status counts elapsed calendar days; a same-day change is 0 days. History starts with the first recorded change; template rows are not historical events.
Recorded events
0
Active status rows
0
Units down now
0
Latest change
—
| Change Date | Unit | Equipment Group | Previous Status | New Status | Change Summary | Status End Date | Days in Status | Date Reported | Vehicle Issue | Fleet Updates and Notes |
|---|
Repair Code Library
Search the supplied repair codes here, or select a code suggestion in the unit issue field. Existing free-text issues remain supported.
| Code | Repair description |
|---|